AnalystAIReal Assets
Start free trialLive market record, the source behind every published figure
As of 20 October 2026, Texas has the most data center sites tracked in the United States (164, 19% of 849), then Virginia (118) and Georgia (48). Ranked by sites tracked, not by power capacity.
Unlock all 871 sites| Rank | State | Sites tracked | Share of sites tracked | Power capacity operating | Power capacity planned | Sites with a figure |
|---|---|---|---|---|---|---|
| 1 | Texas | 164 | 19% | 9.9 GW | 74.7 GW | 113 of 164 |
| 2 | Virginia | 118 | 14% | 7.8 GW | 21.9 GW | 85 of 118 |
| 3 | Georgia | 48 | 6% | 2.1 GW | 10.5 GW | 37 of 48 |
| 4 | Ohio | 45 | 5% | 3.8 GW | 17.4 GW | 32 of 45 |
| 5 | California | 41 | 5% | 531 MW | 2.5 GW | 22 of 41 |
| 6 | Illinois | 37 | 4% | 1.2 GW | 11.2 GW | 23 of 37 |
| 7 | Arizona | 34 | 4% | 2.6 GW | 9.8 GW | 29 of 34 |
| 8 | Indiana | 22 | 3% | 3.7 GW | 9.2 GW | 17 of 22 |
| 9 | North Carolina | 21 | 2% | 591 MW | 4.8 GW | 16 of 21 |
| 10 | Pennsylvania | 21 | 2% | 960 MW | 10.1 GW | 20 of 21 |
| 11 | Iowa | 17 | 2% | 2.0 GW | 6.2 GW | 13 of 17 |
| 12 | Nevada | 17 | 2% | 1.3 GW | 8.7 GW | 14 of 17 |
| 13 | New York | 15 | 2% | 360 MW | 1.3 GW | 6 of 15 |
| 14 | New Jersey | 14 | 2% | 685 MW | 680 MW | 8 of 14 |
| 15 | Washington | 14 | 2% | 709 MW | 1.6 GW | 7 of 14 |
Full market dataset & site-level records
This page lists the largest states by sites tracked. Sign in or start a trial to inspect every facility, 152 operators and the source document behind each figure.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 20 October 2026.
By sites tracked: the number of data center sites Real Assets has recorded in each state. It is not a ranking by power capacity. Operating is a site that is open. Planned is a site that is not open yet: announced, planned or under construction. They are shown in separate columns and never added together.
No. It shows the 15 states with the most sites tracked. Counts are sites Real Assets has recorded, not a census of the data center market in the United States. Power capacity is reported for some sites only: the last column says for how many, and a blank means not reported, not zero.
Operating is a site that is open. Planned is a site that is not open yet: announced, planned or under construction. They are shown in separate columns and never added together.