AnalystAIReal Assets
Start free trialLive market record, the source behind every published figure
As of 20 October 2026, Real Assets tracks 65 data center sites listed under CyrusOne in the United States: 49 operating and 16 planned or under construction. Reported power capacity: 555 MW operating, 2.8 GW planned or under construction. It ranks number 3 by sites among 151 named operators, with 8% of the 849 sites tracked. Largest states: Texas (23), Virginia (10), Illinois (7).
Open the data centers dataReal Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 20 October 2026.
65 tracked as of 20 October 2026: 49 operating and 16 planned or under construction. This is what we have recorded, not a full census.
Largest states by sites: Texas (23), Virginia (10), Illinois (7), Ohio (6), Arizona (4).
Reported power capacity: 555 MW operating, 2.8 GW planned or under construction.
It ranks number 3 of the 20 largest named operators by sites tracked. The largest is Digital Realty with 83.
Figures link to the page that published them. Publishers behind Real Assets data include Public Storage, Americold, Unite Students, Inside Self-Storage, Baxtel.
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data